Skip to Content
| GAGE


 Power Test Reports

Equipment Power Usage Testing

Equipment Power Usage Testing The following power tests were conducted on GPS receivers, GPS antennas, and select communications devices using an A-D device on a computer, using LabView sampling at a rate of 20mSec. Most receiver tests were conducted... Read More

Power - Wind Power Testing at UNAVCO through 2005 (summary)

Wind Power Testing at UNAVCO through 2005 Alternative Power Source for Continuous GPS Stations With an increasing number of GPS site installations in locations such as Antarctica and Alaska, it is important to examine renewable energy alternatives.... Read More

Power - Wind Power Testing at UNAVCO through 2005, Phase 1

Wind Power Testing at UNAVCO through 2005, Phase 1 The purpose of phase one of the wind generator testing is to become familiar with the general setup and power characteristics of the system. This includes tower construction, cabling, regulation and... Read More

Power - Wind Power Testing at UNAVCO through 2005, Phase 2

Wind Power Testing at UNAVCO through 2005, Phase 2 This phase of the test will concentrate on answering the following questions: How will the wind generator perform in a realistic wind/solar hybrid GPS station? Assume a load of 15-20 Watts. What is... Read More

Power - Wind Power Testing at UNAVCO through 2005, Phase 3

Wind Power Testing at UNAVCO through 2005, Phase 3 Status as of 6 Nov 2002: The wind system is up, running and charging, but not generating as much power as before. We are investigating.   The University of Colorado Mountain Research... Read More

Power Draw Profile for Trimble NetRS and Iridium Systems

Power Draw Profile for Trimble NetRS and Iridium System Test Summary UNAVCO performed a benchtop test to record a high-resolution time history of power consumed by a Trimble NetRS GPS system with Iridium communications. The test system consisted of... Read More

Results 1 - 10 of 20
 

Last modified: 2019-12-27  16:36:35  America/Denver