Skip to Content
| GAGE


 Shallow Braced (drilled and non-drilled)

Shallow drilled braced monument installation tutorial

Shallow drilled braced monument installation tutorial To see a larger version of any image, right-click and select "View Image." Locate site – fresh, unweathered bedrock is best. Clear pad approximately 5 ft square. Mark center point for... Read More

Shallow Drilled Braced Monument Overview

Shallow Drilled Braced Monument Back to comparison table Mount Commonly Used Stability Cost Install Time Labor Substrate Site Impact SCIGN mount high $800+ 1-3 d 2-3 BR med The shallow drilled braced monument (SDBM)... Read More

Short Drilled Braced Monument Installation Tutorial

Locate site. Fresh, unweathered bedrock is best. Clear a pad approximately 5 ft square. [Figure 1] Mark center point for vertical leg with chalk. [Figure 2] Drill vertical hole approximately 36” deep using 36”x1.5” drill bit (or... Read More

 

Last modified: 2019-12-27  16:36:35  America/Denver