| UNAVCO
 


Knowledge Base

Vaisala - How to configure a Trimble NetRS for use with a Vaisala WXT510 metpack in the Plate Boundary Observatory

How to configure a Trimble NetRS for use with a Vaisala WXT510 metpack in the Plate Boundary Observatory

  1. Create ’Met_Z’ data logging session and enable

    • continuous logging

    • file duration ’60’min

    • T00 ’off’ Binex ’on’

    • Binex options

      • Measurements

        • ’15 Sec’ interval

        • all optons ’off’

        • System Status Record ’off’

      • Metadata

        • ’30 Min’ interval

        • Site decription ’on’

        • Station ID ’on’

        • Firmware Version ’on’

        • All others ’off’


    • File naming (The Session Identifier) ’z’

    • Directory options ’Create Per-SessionID subdirectories’

  2. Set reserve space for ’z’ session data.

    • Set Autodelete to ’10’ MBytes

    • Set pool ’z’ size to ’100’ MBytes and enable Autodelete

    • Reset pool ’c’ size to ’500’ MBytes

  3. Set I/O SerialPort 2 and enable

    • Service ’Met-Tilt’

    • Baud 19200

    • Parity ’None’

    • Flow Control ’None’

    • Parameters for Met/Tilt mode
      0R0    1 minutes

Attached Files
There are no attachments for this article.
Comments
There are no comments for this article. Be the first to post a comment.
Name
Email
Security Code Security Code
Related Articles RSS Feed
Vaisala Weather Transmitter WXT520 User's Guide (2008)
Viewed 1409 times since Mon, Feb 1, 2010
Vaisala - How to integrate the Vaisala WXT520 with the Topcon NET-G3
Viewed 7458 times since Tue, Jan 26, 2010
WXT520 Ordering guide
Viewed 2201 times since Mon, Mar 24, 2014
How to integrate the Vaisala WXT510/520 and the Septentrio PolaRx5 (Web User Interface)
Viewed 2458 times since Tue, Apr 19, 2016
Vaisala - How to integrate the Vaisala WXT520 with the Ashtech MicroZ
Viewed 5789 times since Tue, Jan 26, 2010
How to integrate the Vaisala WXT510/520 and the Septentrio PolaRx5 (Command Line)
Viewed 2821 times since Fri, Jan 8, 2016
Vaisala Weather Transmitter WXT510 Order Guide (USD)
Viewed 1199 times since Wed, Feb 18, 2009
Vaisala - How to build a DB9 serial connector for the Vaisala W510 or 520 met pack
Viewed 26095 times since Tue, Jan 26, 2010
How to Mount a Vaisala WXT 520 Met Pack
Viewed 6337 times since Mon, Dec 20, 2010
Vaisala WTX510/520 configuration file
Viewed 4954 times since Wed, Jul 1, 2009
MENU
 

Last modified: 2019-12-27  16:36:35  America/Denver