Trimble NetRS - Power Draw Tests

Trimble NetRS - Power Draw Tests

UNAVCO performed a short benchtop test series to determine the difference in power draw by a Trimble NetRS receiver when connected to three common geodetic GPS antennas.

All tests were performed at room temperature. A variable DC power supply was used to deliver a 12.0 volt input to the NetRS, with current monitored using a Fluke 73III multimeter. The receiver was allowed to dwell for 3-4 minutes after each antenna change, to ensure satellite tracking had stabilized and data logging had commenced. This test was repeated twice for each configuration. No radomes were used with either Choke Ring antenna.

Results from the test series are presented in the table below. The power draw of the NetRS without an antenna was also measured and is shown for comparison.

Antenna Model Part Number NetRS average
power draw (W)
No Antenna
2.68
Ashtec Choke Ring 701945-01 3.06
Trimble Choke Ring 29659-00 3.18
Trimble Zephyr Geodetic   41249-00 3.54

Power draw tests on a variety of other GPS and communications equipment have also been performed by UNAVCO. Results are located here.

Attached Files
There are no attachments for this article.
Comments
There are no comments for this article. Be the first to post a comment.
Name
Email
Security Code Security Code
Related Articles RSS Feed
UNAVCO 2003 GPS Receiver and Antenna Testing in Support of the Plate Boundary Observatory (PBO)
Viewed 3078 times since Thu, Jul 16, 2009
GPS Receiver and Antenna Testing Report for SuomiNet (2000)
Viewed 4070 times since Wed, Mar 24, 2010
Trimble NetR9 Power Consumption
Viewed 7074 times since Tue, Oct 4, 2011
Power - Wind Power Testing at UNAVCO through 2005, Phase 3
Viewed 3538 times since Sat, Mar 27, 2010
Iridium & GPS/GNSS Inteference from Iridium Data Transmitters
Viewed 18436 times since Mon, Oct 24, 2011
Summary Report on Forgen 500 Wind Turbine Performance (2007)
Viewed 7747 times since Sat, Mar 27, 2010
Power - Wind Power Testing at UNAVCO through 2005, Phase 1
Viewed 3429 times since Sat, Mar 27, 2010
Power - Wind Power Testing at UNAVCO through 2005 (summary)
Viewed 2584 times since Sat, Mar 27, 2010
Trimble NetRS - How to track and log L2C
Viewed 6670 times since Fri, Nov 2, 2012
MENU

Last modified: Monday, 12-May-2014 00:18:29 UTC