Trimble NetR9 power draw tests

* NetR9 internal UPS should be configured to only charge internal battery when system voltage is 13+ volts

Attached Files
There are no attachments for this article.
Comments
There are no comments for this article. Be the first to post a comment.
Name
Email
Security Code Security Code
Related Articles RSS Feed
GNSS Antenna Power Consumption Testing
Viewed 5930 times since Wed, Nov 26, 2014
Trimble NetR5, NetR8 and NetR9 - Critical Power-On/Off Configuration Details
Viewed 12067 times since Thu, Oct 11, 2012
Javad Sigma Power Consumption
Viewed 7277 times since Wed, Oct 5, 2011
HTTPS: Firefox workaround for Trimble receivers
Viewed 2703 times since Wed, Jan 25, 2012
Power - Wind Power Testing at UNAVCO through 2005, Phase 1
Viewed 4417 times since Sat, Mar 27, 2010
Equipment Power Usage Testing
Viewed 10341 times since Sun, Mar 28, 2010
Trimble NetR9 Resource Page
Viewed 41005 times since Mon, Aug 17, 2015
Power - Wind Power Testing at UNAVCO through 2005 (summary)
Viewed 3532 times since Sat, Mar 27, 2010
Septentrio PolaRx4 Power Consumption
Viewed 4697 times since Thu, Sep 29, 2011
Power Draw Profile for a Trimble NetRS and Iridium System (polar)
Viewed 10736 times since Sun, Mar 28, 2010
MENU
 

Last modified: 2019-12-27  16:36:35  America/Denver