| UNAVCO
 


Knowledge Base

Septentrio PolaRx5 Power Consumption

  • All values were measured using an Agilent DC Power Analyzer
    • Power consumption was measured at 12 V
  • Measured values are given with 10% margin of error
    • Power values will fluctuate with the number of visible satellites tracked
  • Users must turn off both satellite and signal tracking to realize power consumption reductions
Criteria GPS L1 and L2 only (W) GPS L1, L2, & L5 (W) GPS and GLONASS (W) All Constellations in view (W)
Minimum possible power consumption 2.0 2.3 2.3 3.1
Ethernet Off - Logging 15-sec Session 2.2 2.4 2.4 3.2

Ethernet Off - Logging 15-sec Session &

1 Hz Session

2.2 2.4 2.4 3.2

Ethernet Off - Logging 15-sec Session & 

10 Hz Session

2.2 2.4 2.4 3.2

Ethernet On - Logging 15-sec session &

1 Hz Session

2.9 3.1 3.1 4.0

Ethernet On - Logging 15-sec session &

1 Hz TCP/IP stream

2.9 3.1 3.1 4.0

Ethernet On - Logging 15-sec Session &

1 Hz Session & 10 Hz TCP/IP stream

2.9 3.1 3.1 4.0
Maximum possible power consumption       4.3
Attached Files
There are no attachments for this article.
Comments
There are no comments for this article. Be the first to post a comment.
Name
Email
Security Code Security Code
Related Articles RSS Feed
Power - Wind Power Testing at UNAVCO through 2005, Phase 3
Viewed 3690 times since Sat, Mar 27, 2010
Trimble NetR9 Power Consumption
Viewed 7298 times since Tue, Oct 4, 2011
Remote Station Power Analysis (2007)
Viewed 3287 times since Sun, Mar 28, 2010
Power Draw Profile for a Trimble NetRS and Iridium System (polar)
Viewed 4467 times since Sun, Mar 28, 2010
Topcon Net-G3A Power Consumption
Viewed 3351 times since Mon, Oct 10, 2011
SLA Battery Cold Performance Tests: Gel vs. AGM
Viewed 15325 times since Sun, Mar 28, 2010
Power Draw Profile for Trimble NetRS and Iridium Systems
Viewed 5906 times since Sat, Aug 28, 2010
Trimble NetRS - Power Draw Tests
Viewed 4707 times since Sun, Mar 28, 2010
Leica GR10 Power Consumption
Viewed 7545 times since Tue, Oct 11, 2011
Power - Wind Power Testing at UNAVCO through 2005, Phase 2
Viewed 3514 times since Sat, Mar 27, 2010
MENU

Last modified: Monday, 12-May-2014 00:18:29 UTC