| UNAVCO
 


Knowledge Base

Power - Wind Power Testing at UNAVCO through 2005 (summary)

Wind Power Testing at UNAVCO through 2005

Alternative Power Source for Continuous GPS Stations

With an increasing number of GPS site installations in locations such as Antarctica and Alaska, it is important to examine renewable energy alternatives. Wind generators can deliver increasingly high amounts of power at an affordable price. When coupled with solar systems, large loads can be powered reliably, even in poor weather or during periods of reduced sunlight (such as in polar regions). Other locations that can benefit from wind power include areas shaded by buildings or mountains, coastal areas and mountain ridges above tree line.

Because of more complex environmental, mechanical and electrical factors, there are concerns. First, reliability of the wind source. A generator is only useful if there is a guaranteed source of wind. Few areas can promise a daily wind. Fortunately, an easy way around this is to increase storage capacity to compensate for stale periods. Second, is the generator going to be reliable? If blades break, brushes wear out or bearings are thrown, is it worth it to send someone out to fix it? Third, do you have quality in your charging? If the charge curve contains a large number of spikes, how is this going to effect your equipment or communications? Lastly, is the power source cost effective? Are you better off just adding more panels and batteries, or can a wind generator reduce the overall cost of your system?

The following phases of testing the generator at UNAVCO are designed to examine theses concerns. Information about the generator, system designs, graphs and pictures about each phase are described and linked to below.

Wind Power for Remote DC Powered Stations (White Paper, May 2003, .pdf)

Wind Generator Specifications (from literature)

  • Manufacturer: Southwest Windpower (http://www.windenergy.com)

  • Model: Air Industrial

  • Voltage: 12V

  • Rotor Diameter: 46 (1.14 Meters)

  • Start-up Wind Speed: 7 MPH (3 m/s)

  • Output: 300 Watts at 28 MPH

System Testing, Data and Pictures

  • Phase 1: Initial testing in high wind enviroment. Establish base test parameters and identify any initial system issues. 4/02-6/02

  • Phase 2: Alternative power management. 8/02-9/02

  • Phase 3: CU MRS Tundra Lab - Extreme Weather Testing. Currently running since 18 September 2002. Includes link to live web cam, installation photos, failure analysis and more...

Send questions or comments about this page to Support (supportunavco.org).

Attached Files
There are no attachments for this article.
Comments
There are no comments for this article. Be the first to post a comment.
Name
Email
Security Code Security Code
Related Articles RSS Feed
Trimble NetR9 Power Consumption
Viewed 7074 times since Tue, Oct 4, 2011
Septentrio PolaRx5 Power Consumption
Viewed 2748 times since Fri, Jan 8, 2016
Trimble NetRS - Power Draw Tests
Viewed 4524 times since Sun, Mar 28, 2010
Power - Wind Power Testing at UNAVCO through 2005, Phase 2
Viewed 3391 times since Sat, Mar 27, 2010
Equipment Power Usage Testing
Viewed 8756 times since Sun, Mar 28, 2010
Power - Wind Power Testing at UNAVCO through 2005, Phase 1
Viewed 3429 times since Sat, Mar 27, 2010
Summary Report on Forgen 500 Wind Turbine Performance (2007)
Viewed 7747 times since Sat, Mar 27, 2010
SLA Battery Cold Performance Tests: Gel vs. AGM
Viewed 14456 times since Sun, Mar 28, 2010
Septentrio PolaRx4 Power Consumption
Viewed 3544 times since Thu, Sep 29, 2011
Leica GR10 Power Consumption
Viewed 7390 times since Tue, Oct 11, 2011
MENU

Last modified: Monday, 12-May-2014 00:18:29 UTC